No Nama Paket Pekerjaan Client Lokasi Periode
1 Fabrikasi Pipe 12.600 Dia Inch dan Pipe
support 86 ton Project SSNP SEI GERONG –
SUMSEL
PT. Alhas Jaya Group Workshop Cilegon –
Banten
2012
2 Field Joint Coating Pipe Line 24” sepanjang 72 km EPC2 Banyu Urip – Exxon PT.IKPT Tuban – Bojonegoro.
Jawa Timur
2012 -2013
3 Equipment Rental for Field Joint
Coating Pipe Line 24” sepanjang 72 km
EPC2 Banyu Urip – Exxon
PT.IKPT Tuban – Bojonegoro.
Jawa Timur
2012
4 Supply Blasting Equipment for pipe
Line 72 km EPC2 Project.
PT.IKPT Tuban – Bojonegoro.
Jawa Timur
2013
5 Remove and Fabrikasi, installasi piping
for shut down PT. Statomer Toyo
Polymer
PT.Statomer PT. Statomer Plant –
Merak – West Java
2013
6 Sipil Work Food Procesing Plant F-21 –
Tanggerang
PT. Petra Sejehtera Abadi Plant PT. Petra
Sejehtera Abadi –
Tanggerang
2013
7 Stell Structure Flatform Acces Paul Wurth International
Site Servises
Posco – KS Plant 2013
8 Sipil Work Struktur Pondasi Pabrik
Batu bata Ringan Mercusuar beton
PT. Pancaran Sewu
Sejehter
Plant Mercusura
Beton CiwandanCilegon
2013
9 Electrical Installasi Food Procesing
Plant F-21 – Tanggerang
PT. Petra Sejehtera Abadi Plant PT. Petra
Sejehtera Abadi –
Tanggerang
2013 s/d 2014
10 Partisi Gibsum untuk Interior controll
room, Laboratorium room dan Cold S
Room, Cooling Down Room dan
Chiller R FG Room.
PT. Petra Sejehtera Abadi Plant PT. Petra
Sejehtera Abadi –
Tanggerang
2014
11 Pekerjaan Pintu Alluminium 3 in +
Acrilic 8 unit Sliding, swing 16 unit dan
Jendela Alluminium 3 in + Acrilic 32
Set
PT. Petra Sejehtera Abadi Plant PT. Petra
Sejehtera Abadi –
Tanggerang
2014
12 Penyambungan Panas & Dingin BW
750 mm Convayer Bel
PT. Enggel Panuan
Tambi
Posco – KS Plant 2014
13 Paul Wurth International
Site Servises
Paul Wurth International
Site Servises
Posco – KS Plant 2014
14 COP Foreman for Laed the worker
team for cleaning nozles in COG Line
BATT #1 & #2
Paul Wurth International
Site Servises
Posco – KS Plant 2014
15 Intallation Stell Work for Flatform,
werkwey, roofing and cleading for KHI
Project
PT. Pipe Coating
Indonesia
PT. KHI Plant –
Cilego
2014
16 Blasting & Painting Works and Fire
Froofing DSLNG Project Senoro –
Sulawesi Tengah
PT. TTP – JGC
Coorporation
DSLNG Senoro 2014
17 Movable Wall Ofice PT. Castroll Oil,
Merak – Banten
PT. Terra Tehnik Perdana Castrol Oil Plant –
Merak
2015
18 Instructur & Inspector, Ultrasonic Flow
meter Detector & Reporting &
Documentation for Fire water
performance test
EXXONMOBIL OIL
INDONESIA, INC .APO
ERT Dept. Lhoksukon
Lhoksukon – Aceh
Utara
2015
19 Manpower Supply for QC Inspector,
Safety Inspector, Supervisor,
Engineering, Surveyor and
Mechanical Skill
CNCEC – Sinarmas Group
GCR Project
Lubuk Gaung –
Dumai
2015 s/d 2016
20 Erection Baja Fixed Bridge Pier 1
Terminal 3 Soekarno Hatta
PT. Hutama Karya Persero PT. Hutama Karya Persero 2017 s/d 2018
21 Erection Baja Perkuatan Module dan
Tumpuan Travelator
PT. Hutama Karya Persero Bandara Sukarno
hatta – jakarta
2017 s/d 2018
22 Erection Stell Fixed Bridge As 18-28.
Pengadaan Crane 25 ton dan tangga
type 1 dan Type 2. Pier 1 Terminal 3
Sukarno Hatta
PT. Hutama Karya Persero Bandara Sukarno
hatta – jakarta
2018
23 Blasting Painting Stell Fixed Pier 1
Terminal 3 Soekarno Hatta
PT. Hutama Karya Persero Bandara Sukarno
hatta – jakarta
2018
24 Erection Structure baja Canopy Hotel,
saparator Lift, all dinning room,
Crown Hotel Transmart juanda
Bekasi – Jawa Barat
PT. Adi Karya Persero Bekasi 2018
25 Blasting painting baja canopy Plaza
Entrance Proyek Gedung A dan B
RSUD Pangandaran
PT. Hutama Karya Persero Pangandaran 2019
26 Painting baja canopy hotel dan
perkuatan travellator area mall,
saparator lift, all dining room dan
loading dock Crown hotel
PT. Adi Karya Persero Bekasi 2019
27 Pekerjaan MEP Electronic Gedung
ABC, Proyek Hotel New Nordic
sudamala, sanur – Bali
PT. Fajar Gemilang Abadi Bali 2019
28 Pekerjaan MEP Fire Alarm, Fire
Hydrant, Fire sprinkle, Gedung ABC,
Proyek Hotel New Nordic sudamala,
sanur – Bali
PT. Fajar Gemilang Abadi Bali 2019
29 Fabrikasi dan Instalasi Pipe sebanyak
90.000 dia Inc Emily 1 Project Fuel
Terminal and Jetty
PT. Alhas Jaya Group BalikPapan –
Kaltim
2019 s/d 2020
30 Blasting & Painting Pipe, Emily 1
Project Fuel Terminal and Jetty
PT. Tripatra Engineering BalikPapan –
Kaltim
2019 s/d 2020
31 Fabrikasi Piperack BPP-II & HCC
(Onshore) tahap 1 (A1, A3, C1, C2 &
C3) Pertamina RDMP RU V
Balikpapan
PT. Fajar Gemilang Abadi Workshop FGS
Cikarang
2019 s/d 2020
32 Pekerjaan MEP Tegangan Rendah,
Gedung ABC, Proyek Hotel New
Nordic sudamala, sanur – Bali
PT. Fajar Gemilang Abadi Bali 2020
33 Insulation & Painting work Cirebon 2
CFPP 1,000MW x 1 Unit -Project
PT. Hyundai Engineering &
Construction Co, Ltd.
PLTU Cirebon2 2020 s/d 2021
34 Instalation Demin Water tank &
servise Water Storage Tank, Riau
GFPP 275 MW IPP Project Tenayan
PT. Inti Tehnik industri Tenayan –
Pekanbaru
2020 s/d 2021
35 Blasting Painting BM Absorber Tank
Cirebon2 Coal Fired Power Plant
Project
PT. Daeah E&C Indonesia PLTU Cirebon2 2021