No | Nama Paket Pekerjaan | Client | Lokasi | Periode |
1 | Fabrikasi Pipe 12.600 Dia Inch dan Pipe support 86 ton Project SSNP SEI GERONG – SUMSEL |
PT. Alhas Jaya Group | Workshop Cilegon – Banten |
2012 |
2 | Field Joint Coating Pipe Line 24” sepanjang 72 km EPC2 Banyu Urip – Exxon | PT.IKPT | Tuban – Bojonegoro. Jawa Timur |
2012 -2013 |
3 | Equipment Rental for Field Joint Coating Pipe Line 24” sepanjang 72 km EPC2 Banyu Urip – Exxon |
PT.IKPT | Tuban – Bojonegoro. Jawa Timur |
2012 |
4 | Supply Blasting Equipment for pipe Line 72 km EPC2 Project. |
PT.IKPT | Tuban – Bojonegoro. Jawa Timur |
2013 |
5 | Remove and Fabrikasi, installasi piping for shut down PT. Statomer Toyo Polymer |
PT.Statomer | PT. Statomer Plant – Merak – West Java |
2013 |
6 | Sipil Work Food Procesing Plant F-21 – Tanggerang |
PT. Petra Sejehtera Abadi | Plant PT. Petra Sejehtera Abadi – Tanggerang |
2013 |
7 | Stell Structure Flatform Acces | Paul Wurth International Site Servises |
Posco – KS Plant | 2013 |
8 | Sipil Work Struktur Pondasi Pabrik Batu bata Ringan Mercusuar beton |
PT. Pancaran Sewu Sejehter |
Plant Mercusura Beton CiwandanCilegon |
2013 |
9 | Electrical Installasi Food Procesing Plant F-21 – Tanggerang |
PT. Petra Sejehtera Abadi | Plant PT. Petra Sejehtera Abadi – Tanggerang |
2013 s/d 2014 |
10 | Partisi Gibsum untuk Interior controll room, Laboratorium room dan Cold S Room, Cooling Down Room dan Chiller R FG Room. |
PT. Petra Sejehtera Abadi | Plant PT. Petra Sejehtera Abadi – Tanggerang |
2014 |
11 | Pekerjaan Pintu Alluminium 3 in + Acrilic 8 unit Sliding, swing 16 unit dan Jendela Alluminium 3 in + Acrilic 32 Set |
PT. Petra Sejehtera Abadi | Plant PT. Petra Sejehtera Abadi – Tanggerang |
2014 |
12 | Penyambungan Panas & Dingin BW 750 mm Convayer Bel |
PT. Enggel Panuan Tambi |
Posco – KS Plant | 2014 |
13 | Paul Wurth International Site Servises |
Paul Wurth International Site Servises |
Posco – KS Plant | 2014 |
14 | COP Foreman for Laed the worker team for cleaning nozles in COG Line BATT #1 & #2 |
Paul Wurth International Site Servises |
Posco – KS Plant | 2014 |
15 | Intallation Stell Work for Flatform, werkwey, roofing and cleading for KHI Project |
PT. Pipe Coating Indonesia |
PT. KHI Plant – Cilego |
2014 |
16 | Blasting & Painting Works and Fire Froofing DSLNG Project Senoro – Sulawesi Tengah |
PT. TTP – JGC Coorporation |
DSLNG Senoro | 2014 |
17 | Movable Wall Ofice PT. Castroll Oil, Merak – Banten |
PT. Terra Tehnik Perdana | Castrol Oil Plant – Merak |
2015 |
18 | Instructur & Inspector, Ultrasonic Flow meter Detector & Reporting & Documentation for Fire water performance test |
EXXONMOBIL OIL INDONESIA, INC .APO ERT Dept. Lhoksukon |
Lhoksukon – Aceh Utara |
2015 |
19 | Manpower Supply for QC Inspector, Safety Inspector, Supervisor, Engineering, Surveyor and Mechanical Skill |
CNCEC – Sinarmas Group GCR Project |
Lubuk Gaung – Dumai |
2015 s/d 2016 |
20 | Erection Baja Fixed Bridge Pier 1 Terminal 3 Soekarno Hatta |
PT. Hutama Karya Persero | PT. Hutama Karya Persero | 2017 s/d 2018 |
21 | Erection Baja Perkuatan Module dan Tumpuan Travelator |
PT. Hutama Karya Persero | Bandara Sukarno hatta – jakarta |
2017 s/d 2018 |
22 | Erection Stell Fixed Bridge As 18-28. Pengadaan Crane 25 ton dan tangga type 1 dan Type 2. Pier 1 Terminal 3 Sukarno Hatta |
PT. Hutama Karya Persero | Bandara Sukarno hatta – jakarta |
2018 |
23 | Blasting Painting Stell Fixed Pier 1 Terminal 3 Soekarno Hatta |
PT. Hutama Karya Persero | Bandara Sukarno hatta – jakarta |
2018 |
24 | Erection Structure baja Canopy Hotel, saparator Lift, all dinning room, Crown Hotel Transmart juanda Bekasi – Jawa Barat |
PT. Adi Karya Persero | Bekasi | 2018 |
25 | Blasting painting baja canopy Plaza Entrance Proyek Gedung A dan B RSUD Pangandaran |
PT. Hutama Karya Persero | Pangandaran | 2019 |
26 | Painting baja canopy hotel dan perkuatan travellator area mall, saparator lift, all dining room dan loading dock Crown hotel |
PT. Adi Karya Persero | Bekasi | 2019 |
27 | Pekerjaan MEP Electronic Gedung ABC, Proyek Hotel New Nordic sudamala, sanur – Bali |
PT. Fajar Gemilang Abadi | Bali | 2019 |
28 | Pekerjaan MEP Fire Alarm, Fire Hydrant, Fire sprinkle, Gedung ABC, Proyek Hotel New Nordic sudamala, sanur – Bali |
PT. Fajar Gemilang Abadi | Bali | 2019 |
29 | Fabrikasi dan Instalasi Pipe sebanyak 90.000 dia Inc Emily 1 Project Fuel Terminal and Jetty |
PT. Alhas Jaya Group | BalikPapan – Kaltim |
2019 s/d 2020 |
30 | Blasting & Painting Pipe, Emily 1 Project Fuel Terminal and Jetty |
PT. Tripatra Engineering | BalikPapan – Kaltim |
2019 s/d 2020 |
31 | Fabrikasi Piperack BPP-II & HCC (Onshore) tahap 1 (A1, A3, C1, C2 & C3) Pertamina RDMP RU V Balikpapan |
PT. Fajar Gemilang Abadi | Workshop FGS Cikarang |
2019 s/d 2020 |
32 | Pekerjaan MEP Tegangan Rendah, Gedung ABC, Proyek Hotel New Nordic sudamala, sanur – Bali |
PT. Fajar Gemilang Abadi | Bali | 2020 |
33 | Insulation & Painting work Cirebon 2 CFPP 1,000MW x 1 Unit -Project |
PT. Hyundai Engineering & Construction Co, Ltd. |
PLTU Cirebon2 | 2020 s/d 2021 |
34 | Instalation Demin Water tank & servise Water Storage Tank, Riau GFPP 275 MW IPP Project Tenayan |
PT. Inti Tehnik industri | Tenayan – Pekanbaru |
2020 s/d 2021 |
35 | Blasting Painting BM Absorber Tank Cirebon2 Coal Fired Power Plant Project |
PT. Daeah E&C Indonesia | PLTU Cirebon2 | 2021 |